Taj Vivanta Hotel Bangalore

1997 -2006

PROJECT DETAILS
167 rooms 178,600SQF built-up area, 0.80mw maximum demand.
RESULTS ACHIEVED
7% Energy Savings verified at NO-COST implementation. Efficiency testing for screw chiller. BMS testing. Installed Harmonic Filter. Solved tripping of centrifugal chiller on grid voltage fluctuations.

ITPL, Bangalore

1,200,000 Sq.ft., 2003

PROJECT DETAILS
Was facing computer monitor fluctuation problem across one vertical involving several clients.
RESULTS ACHIEVED
Solved EMI problem by installing appropriate sized EMI Shield. Conducted Power Quality Study.

Denso Kirloskar Ltd., Bengaluru

2002- 2017. Repeat jobs. Faced problem after installing 1200A active harmonic Filters and 1350kvar STATCOM.

PROJECT DETAILS
Passenger Car Common Heat Exchanger & car HVAC manufacturing plant. Facing thyristor and electronics card failures with its Thyristor controlled furnace. Again with it expanded capacity with active filter & STATCOM in 2015 started facing harmonic problems
RESULTS ACHIEVED
In 2002 installed tuned harmonic filters & resolved voltage fluctuation/sag tripping & thyristor failures with NBF Furnace. In 2015 undertook PQ harmonic analysis with expanded plant capacity and supplied harmonic filter for NBF Furnace & solved problem.

Hindustan Aeronautics Limited, space avionics

Bangalore, 1999- 2004, Repeat jobs.

PROJECT DETAILS
Avionics equipment manufacturer for defense sector. Problems with incoming power supply at 2x 15mva transformer of 66kv/11kv substation and sets of 2mw, 11kv diesel generator's supply.
RESULTS ACHIEVED
Solved Synchronization rejection problem with sets of 2mw, 11kv DGs.