G.W. Precision Tools Ltd., Bangalore

2002 -2012, Repeat Jobs. 

PROJECT DETAILS
Precision Tools manufacturer. DG Alternator burnt. CNC m/c electronic failures.
RESULTS ACHIEVED
Earthing grid designed. Power system monitorting done and defects rectified.

ACR Towers, Multi tenanted bldg

Bengaluru, 2004 - 2011, Electrical and HVAC consultancy and Design Audit. Repeat jobs.

PROJECT DETAILS
To enhance DG capacity limitation for catering to full building load. 24/7 Electro mechanical operations and maintenance, O&M services. To solve voltage fluctuation tripping with 2nos 250TR trane screw chiller. Electrical consultancy for optimum SLD.
RESULTS ACHIEVED
Installed Tuned Harmonic filter and that resolved all issues. It also resolved the chiller's frequent tripping issues. Undertook energy management study for matching energy sub metering error for appropriate billing to its tenant clients.

Turbo energy Ltd, Paiyanoor

Mahabalipuram, 2013 to 2017, Repeat jobs. Faced problem with UPS active harmonic filter.

PROJECT DETAILS
Was facing CNC, UPS & chiller vfd drives electronics card failures, lighting ballast, and motor burning issues and in addition voltage sag (fluctuation) tripping for CNC m/c. Local Utility company/ TNEB mandated limiting harmonics at it 11kv.
RESULTS ACHIEVED
Installed 831A main transformer and a 88A chiller end harmonic filters, mitigated harmonics within IEEE 519 norms, and eliminated all failures.