Power System measurements

Qualcomm India Ltd, Bangalore

2008

PROJECT DETAILS
Data Center for CDMA/GSM telecommunication system
RESULTS ACHIEVED
Root Cause analysis for Data Center blank out problem. DG alternator failure. ATS malfunction.

Adventity BPO India, Mumbai

2007

PROJECT DETAILS
2 IT/BPO facilities at Mumbai
RESULTS ACHIEVED
Power quality and harmonic analysis carried out and report with recommendations submitted.

IOCL Barauni Refienry thro' NTPC/Siemens

2007

PROJECT DETAILS
Crude Oil refinery plant.
RESULTS ACHIEVED
Troubleshooting power quality and harmonics analysis for power plant's voltage fluctuations and electrical installation issues.

Bharat Petroleum Corporation Ltd R&D, Greater Noida

2011, BPCL.

PROJECT DETAILS
Refinery company's central R&D and Testing Center.
RESULTS ACHIEVED
Power quality and harmonic analysis carried out and report with recommendations submitted. Earthing and Grid earthing designed for preventing equipment failures.

SAIL Alloy Steel Plant, thro' Rockwell Automation Durgapur

2013 West Bengal.

PROJECT DETAILS
Billet Blooming Mill with 120mw CPP power plant coal fired, grid synchronized at 220kv. The BBM with 2x 25kva, 33kv/6.6kv transformers1,000TPD (each bloom about 4Ton).
RESULTS ACHIEVED
Power Systems Study for Rockwell supplied 12pulse Thyristor Converters for BBM.

G.W. Precision Tools Ltd., Bangalore

2002 -2012, Repeat Jobs. 

PROJECT DETAILS
Precision Tools manufacturer. DG Alternator burnt. CNC m/c electronic failures.
RESULTS ACHIEVED
Earthing grid designed. Power system monitorting done and defects rectified.

GE BE Ltd, Bangalore

1999 -2006

PROJECT DETAILS
Bio Medical equipment manufacturer
RESULTS ACHIEVED
Power System analysis and earthing grid sizing. Troubleshooting electrical failures

Birla Manikgarh cement

1997, Chandrapur

PROJECT DETAILS
1.5mtpa capacity gray cement manufacturing plant
RESULTS ACHIEVED
Power quality and harmonic analysis carried out and report with recommendations submitted.

Divya sree Elan homes

Bangalore, 2013.

PROJECT DETAILS
An upscale residential apartment building clusters of 9blocks each with a 10story apartment buildings totally 387apartments spreading over a plot area of 7,92 acre.
RESULTS ACHIEVED
Power auditing for electrical power system done including optimum DG sizing. Root cause analysed for cable lug overheating and report with solutions provided.