Vedanta Sterlite Industries Tuticorain, thro' Siemens

2007

PROJECT DETAILS
Copper Smelter and Copper specialities manufacturing plant.
RESULTS ACHIEVED
Root-cause analysis for electronic, ct failure and ACB uP relay malfunction in the Furnace and Hot Rolled Mill Section.

Amforge Industries Pune

2001, Maharashtra

PROJECT DETAILS
Induction Furnace Casting and Forging plant
RESULTS ACHIEVED
Harmonic study carried out and report submitted.

Galaxy Transmission Sangli

2013,  Maharashtra

PROJECT DETAILS
Rolling mill 1,000tpm and Conductor 1,500tpm capacity manufacturing plant
RESULTS ACHIEVED
Power quality and harmonic analysis carried out and report with recommendations submitted.

Comprehensive Power Quality & Harmonic Audit Study with solutions in a large tyre manufacturing plant

Abstract: Large continuous process plants are increasingly resorting to use of non linear loads (NLL) such as DC drives, variable speed AC drives, UPS, increased electronic controls etc. to improve performance and productivity of their plants. The plant engineers are increasingly facing unfamiliar problems related to power quality (PQ) mainly problem of distortion of fundamental wave shape and associated effects.  

Solving power system harmonic resonance; improving power quality and eliminating electrical failures

Abstract: An Electrical Arc Furnace in the vicinity of a hyperactive railway traction line was facing an unusual power quality harmonic distortion problem. The Gigantic 22kA copper bus bar used to overheat visibly red-hot, vibrate audibly loud loosening its nuts and bolts and wear out the bus bar's affected plates.