Energy Savings

Bannari Amman Sugars Ltd, Nanjangud

Repeat 2010 Mysore

PROJECT DETAILS
7500tcd crushing capacity cane sugar plant with 36mw co-generation power plant with 45mva,11kv/66kv grid synchronizing transformer. Supplied 5nos 725A, 690V Tuned Harmonic Filters across 3nos 3.15mva, 11kv/690v - 690v converter transformers.
RESULTS ACHIEVED
Each converter transformer connected to 2nos 937kw dc mill motors across its two 690v secondary winding. 10% Energy savings verified. Eliminated DC drives electronic card failure and voltage sag tripping.

Bannari Amman Sugars Ltd, Sathayamangalam

Repeat 2009 -2010  Tamil Nadu

PROJECT DETAILS
4000tcd crushing capacity cane sugar plant with 20mw Turbo Generator Co-generation power plant. Supplied 4nos 790A tuned harmonic filters across three winding converter transformers 2nos, 2.5mva 11kv/433v.
RESULTS ACHIEVED
First transformer connected a 750kw DC Motor through a doublet converter and Second one to 670kw and 450kw dc mill motors across its two secondary winding. 10% Energy savings verified. Eliminated DC drives electronic card failure and voltage sag tripping.

Wipro Technologies, Bangalore

1999 -2003, Repeat jobs.

PROJECT DETAILS
At 10-facilities across Bangalore. IT/Software development and data centers. Energy Audit. Energy and DG SEGR analysis
RESULTS ACHIEVED
7% Energy Savings verified with NO-COST implementation with several building's HVAC system through process optimization. Shared fees through performance contracting energy savings.

Infosys Technologies Limited, Bangalore

2003

PROJECT DETAILS
Software development center with four building modules at Electronics City, Bangalore
RESULTS ACHIEVED
14% Energy Savings verified with NO-COST implementation with the building's HVAC system through process optimization.

Gulmohar Paper Ltd, Calcutta

2000

 

PROJECT DETAILS
Writing, Printing and Packaging Paper Manufacturing Plant.
RESULTS ACHIEVED
Energy savings verified. Energy and total power management

Emami Paper Limited, Balasore Orissa

2000-2006, Repeat jobs

PROJECT DETAILS
Writing, Printing and Packaging Paper Manufacturing Plant.
RESULTS ACHIEVED
Energy Savings verified at NO-COST implementation

Sunil healthcare Ltd, Alwar Rajasthan

2010 -2012, Repeat jobs.

 

 

PROJECT DETAILS
20MPD empty gelatin capsules plant. Major energy & Diesel fuel savings were achieved through process optimization. HVAC&R hot water boilers were switched off and instead condenser hot water with little AHU modifications were used for Humidity control.
RESULTS ACHIEVED
9% Energy Savings verified at NO-COST implementation. HVAC&R optimization through process optimization implementation and energy consultancy.

Lake Chemicals Ltd, Bangalore

1998

PROJECT DETAILS
Bulk drug manufacturing facility.
RESULTS ACHIEVED
5% Energy Savings verified at NO-COST implementation

Coromandel Paints Nuzvid, Vijayawada

2016

PROJECT DETAILS
4,000 KL per month capacity paints manufacturing plant. An Asian Paint brand plant.
RESULTS ACHIEVED
8% Energy Savings verified at NO-COST implementation.

Meta Copper and Alloys Ltd Goa

2006

PROJECT DETAILS
HRM and CRM for Copper & Bronze Specialties manufacturing. Supplied 2sets harmonic filters for 4mva,11/0.575-0.575kV, Dd0yn5, 6.4%, CRM Transformer with ETR-2x 265kw, DTR-2x 265kw, Mill-2x500kw, pay off-1x 65kw DC Motors. 2x 6.3MVA, 33/11kV DG Incomer.
RESULTS ACHIEVED
8% Energy Savings verified with harmonic filter installation. Debottlenecked capacity limitation and enhance production by 25%.